Station |
Thumbnail |
Description |
Photo Date (M/D/Y) |
1st Street West. |
|
1st Street West Station is one of the busiest downtown stations. It will be rebuilt and moved to the east side of 1st Street S.W. from it's current location on the west side during the late/early 2004/2005. |
3/19/2004 |
4th Street West. |
|
4th Street West Station is the only station that has the extensive plus 15 walkway (a walkway connecting many buildings in downtown Calgary) lead dirrectly onto the platform. |
3/19/2004 |
7th Street West. |
|
7th Street West Station sits in front of the downtown Sandman Hotel and a Moxie's. The station is also the last downtown station for all northwest trains. |
3/19/2004 |
Anderson |
|
Here is a view of the Anderson platform and station seen from the north side grade crossing. |
8/08/2003 |
Anderson Garage |
|
Here is a view of the Anderson Shops from the Anderson C-Train Station. This is where most of the C-Train maintaince is done. Photo By Ashton Wong |
8/11/2003 |
City Hall |
|
City Hall Station shortly after sunset with a U2 and SD160 consist both insight. |
12/05/2003 |
Dalhousie |
|
Dalhousie Station seen in it's first day of revenue service with an SD160 consist arriving. Many more photos of this station under construction can be found here. |
12/15/2003 |
Erlton Stampede |
|
A view of downtown Calgary on an overcast day seen from Erlton Stampede Station. |
6/07/2002 |
Fish Creek Lacombe |
|
Fish Creek Lacombe Station with two SD160 consists in view. Although the consist on the right was having a malfunctioning door on one of it's cars. |
12/06/2002 |
Olympic Plaza |
|
A 3-car U2 Consist is seen here at Olympic Plaza Station bound for 10th Street West. |
3/19/2004 |
Heritage |
|
Heritage Station is one of the 3 stations that are nearly indentical on the south line. The other two stations are Chinook and Southland. |
2/12/2004 |
Shawnessy |
|
Shawnessy Station as shown under construction. This station opened on June 28th, 2004 as part of phase II of the SLRT extension. Many more photos of this station under construction can be found here. |
12/05/2003 |
Somerset-Bridlewood |
|
Somerset-Bridlewood Station as shown under construction. This station opened on June 28th, 2004 as the new end of the line 201 Line on phase II of the SLRT extension. Many more photos of this station under construction can be found here. |
12/05/2003 |
Sunnyside |
|
Sunnyside Station on a rainy day in May. This station is the last one before There are several abnormality's in this photo. First there are two big buses at the station. Normally only bus routes 405 and 419 (both are full time commnunity shuttle size bus routes ) serve the station. On this particular weekend, track maintaince was being performed downtown; therefore, passengers had to get off at Sunnyside Station and take a Route 551 C-Train shuttle downtown. |
5/22/2004 |
Whitehorn |
|
Whitehorn Station is the end of the line of the Northeast 202 line. It is among 3 of the stations on the northeast line that shares this look and design. The other two station's are Rundle and Marlborough. All 3 of these station's run an exclusive ROW in the middle of 36th Street N.E. with various grade crossings for motor traffic. |
2/12/2004 |